Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
10.2.
|
The
representative of the Contractor shall use the report forms approved by
the Company to provide the following
information:
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
A
daily report of performance and the scopes performed shall be submitted to
the representative of the Company on the day following the accounting one.
The representative of the Company shall approve in writing such report
completely or partially, which means that the scopes performed are
accepted. Based on daily reports an Acceptance Certificate for the
accounting period shall be executed at the end of calendar
month;
|
|
●
|
A
monthly statistical report submitted during the Work Performance as per
form agreed upon between the
Parties.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
a.
|
If
the information recorded on the damaged and/or lost tapes can be restored
from the original, the Contractor shall undertake to restore it, rewriting
it on new empty tapes.
|
|
b.
|
If
the information recorded on the damaged and/or lost tapes cannot be
restored from the original, the Contractor must remake corresponding parts
of the profiles sufficient for rewriting of the damaged and/or lost
initial data, doing the work on behalf of the Company for the account of
the Contractor.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
a.
|
Execution
of the Work, which involves expenses that are charged to the Company
according to this Agreement;
|
|
b.
|
Any
contractual provision of this Agreement, according to which the Contractor
bear commitments that are easily checked after their
fulfillment.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
Promptly
assign a task under this Agreement.
|
|
●
|
Carry
out daily accepting of data, sign daily reports (Daily
report).
|
|
●
|
Sign
acceptance-delivery certificate for field data of the last month not later
than 1 working day after completion of monthly
works.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
(
A) the following address for the Contractor:
Petroleum
Depot, Daulet village, Munaily district, 130005, Mangistau region,
Republic of Kazakhstan
Att:
Kalimukhanova Z.
|
(B)
the following address for the Company:
Petroleum
Depot, Daulet village, Munaily district, Mangistau region, Republic of
Kazakhstan
Att.:
Tolmakov Т.К.
Telephone:
465880 (ext. 1100)
Fax:
465880
|
|
The
Contractor
|
The
Contractor
|
|
“Geo
Seismic Service” LLP
Petroleum
Depot, Daulet village, Munaily district, 130005, Mangistau region,
Republic of Kazakhstan
TRN:
430800000537
Bank
details:
A/с №
________________ in ____________ JSC, Aktau
BIC
________________
VAT
Registration Certificate:
No
certificate due to the fact that it is not a VAT payer
|
Azimuth
Energy Services JSC
Oil
tank farm, Daulet village, Munailinsky district, Mangistau region,
Republic of Kazakhstan
RTN
600900501891
Bank
details:
Bank
Center Credit JSC,
Address:
Bank
code: BIC 192901704
A/c
No IIC:
№4467978
(KZT)
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
On
behalf of
“Geo
Seismic Service” LLP
Stamp
here
_______________________________
|
On
behalf of
Emir
Oil LLP
Stamp
here
__________________________________
|
|
Name:
Kalimukhanova Z.
Position:
Director
|
Name:
Tolmakov Т.К.
Position:
Director General
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Pos.
№
|
Parameter
|
Observation
parameters
|
||
|
Main
3D acquisition parameters:
|
||||
|
1
|
Rated
fold seismic survey
|
112
|
||
|
Inline
Fold
|
14
|
|||
|
Crossline
Fold
|
8
|
|||
|
2
|
Bin
dimension [m]
|
25
х 25
|
||
|
3
|
MAX
min offset [m]
|
388,9
|
||
|
4
|
Maximum
offset "Sh.-Rec."
[m]
|
5041
|
||
|
5
|
Minimum
offset “Sh.-Rec.”
|
4463
|
||
|
6
|
Size
half axic of patch [m
х m]
|
4175,0
|
х
|
2825,0
|
|
-
Inline) - Xr [m]
|
4175,0
|
|||
|
-
Crossline - Xs [m]
|
2825,0
|
|||
|
Survey
density parameters:
|
||||
|
7
|
Survey density (number
of bins per sq km)
|
1600
|
||
|
8
|
Integral survey density
(Number of traces per sq km)
|
179200
|
||
|
9
|
Number
of Shots per square
kilometer (NS
per sq.km.)
|
66,67
|
||
|
10
|
Number
of Receivers per square
kilometer (NR per
sq.km.)
|
66,67
|
||
|
Receiver
line geometry within template:
|
||||
|
11
|
Number
of receiver lines per
swath (NRL) [m]
|
16
|
||
|
12
|
Receiver
Line
Interval (RLI) [m]
|
300
|
||
|
13
|
Number
of receivers per
line (NRpL) [m]
|
168
|
||
|
14
|
Receiver
Interval (RI) [m]
|
50
|
||
|
15
|
(Number
of active channels) (NC)
|
2688
|
||
|
Source
line geometry within template:
|
||||
|
16
|
(Number
SLs)
|
1
|
||
|
17
|
Shot
Line Interval (SLI)
|
300
|
||
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
18
|
Number
shot points per source line & per Template
(Salvo)
|
24
|
||
|
19
|
Shot interval (SI)
[m] - along X
|
50
|
||
|
Shot Interval (SI)
[m] - along Y
|
||||
|
Template
replacements:
|
||||
|
20
|
Inline
Roll:
|
|||
|
-
Number of intervals between SLs
|
1
|
|||
|
-
in meters
|
300
|
|||
|
21
|
Crossline
Roll:
|
|||
|
-
Number of RLs
|
4
|
|||
|
-
in meters
|
1200
|
|||
|
Layout
arrangement:
|
||||
|
22
|
Layout
of shot lines (Normal orthogonal, Brick, Zigzag etc.)
|
Normal
Orthogonal
|
||
|
23
|
Type
of recording spread (inline)
|
Symmetric,
Split-Spread
|
||
|
Corner
points
|
Corner
point coordinates
|
|
|
Northern
latitude
|
Eastern
longitude
|
|
|
1
|
43°
50' 00″
|
51°
29' 57″
|
|
2
|
43°
53' 00″
|
51°
14' 56″
|
|
3
|
43°
59' 27″
|
51°
14' 56″
|
|
4
|
43°
58' 44″
|
51°
19' 56″
|
|
5
|
43°
57' 15″
|
51°
24' 56″
|
|
6
|
43°
55' 00″
|
51°
29' 56″
|
|
Equipment
|
Type
|
Q-ty
|
|
Computer
|
Pentium
IV 1.7 GHz 256 Мб
|
1
|
|
Monitor
|
Samsung
550 17"
|
1
|
|
Disc
memory
|
40
Gbite
|
1
|
|
Black-white
printer
|
HP
or similar
|
1
|
|
UPS
|
Champion
600
|
1
|
|
●
|
Provision
of surveyor with an assignment for reception and source points stationing
in accordance with the pre-planned
project.
|
|
●
|
On-line
correction of actual reception and source points depending on surface
conditions – layout of offsets and compensation shot points, calculation
of theoretical fold and attributes of
bin
|
|
●
|
Provision
of assignments to senior seismic station operator for registration of
source points as scripts and
SPS-files.
|
|
●
|
Entering
the theoretical, accepted, laid out and worked source and reception points
into the field database and generation of work progress
maps
|
|
●
|
Daily
inspection of worked out source points and generation of actual maps of
folds and actual in attributes.
|
|
|
Preparation
and verification of final SPS-files for the purpose of their processing
and submission to the Company.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
Statistic
information (number of shots, non-worked out source points, additional
shots, offsets, etc.)
|
|
●
|
Statistic
information (number of shots, non-worked out source points, additional
shots, offsets, etc.)
|
|
●
|
Progress
maps, fold maps
|
|
●
|
Final
SPS files along with statistics on the whole
area
|
|
●
|
CDPM
station operator report
|
|
●
|
Statistic
information (number of shots, non-worked out source points, additional
shots, offsets, etc.)
|
|
●
|
Fold
maps with indication of reception and source points layout and site
outline
|
|
●
|
Azimuth
and offset distance maps
|
|
●
|
Comments
to the technique and method of field survey (as a part of the final
report)
|
|
●
|
all
line numbers, geophysical survey points shall be agreed at the moment of
assignment receipt prior to topographic
survey;
|
|
●
|
it
is banned to use any other line numbers or survey points on tapes, files,
maps, reports or any other relevant documentation to be submitted to
Company for review;
|
|
●
|
the
Contractor shall under no circumstance change the agreed line
numbers;
|
|
Description
of local mapmaking procedure
|
|
|
Coordinate
system
|
WGS
84
|
|
Reference
ellipsoid
|
WGS
84
|
|
Spheroid
form
|
эллипсоид
|
|
Major
semiaxis (a)
|
6378137.000
|
|
Reverse
compaction (1/f)
|
298.257223563
|
|
Projections:
|
|
|
Map
projection:
|
Universal
Transverse Mercator (UTM)
|
|
Zone
|
39 N
|
|
Principal
meridian longitude
|
51°
E
|
|
Scaling
factor
|
0.9996
|
|
Initial
longitude
|
0° 0 ́ 0 ˝
N
|
|
Offset
along Y
|
500000
m
|
|
Offset
along X
|
0
m
|
|
Unit
of measurement
|
International
meter
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
|
Report
provided to the Company upon completion of works shall
include:
|
|
●
|
GPS
reference network scheme;
|
|
●
|
Coordinates
and elevations of all source and reception points in SPS, SEGP1 or other
formats agreed with the Company;
|
|
●
|
Well
layout table;
|
|
●
|
Table
of coordinates – beginning-end of line
(3D):
|
|
●
|
Topographic
survey quality control data;
|
|
●
|
Layout
of worked out source and reception points in the scale agreed with the
Company;
|
|
●
|
Geodetic
parameters including spheroid and
projection;
|
|
●
|
Description
of works;
|
|
●
|
Equipment
and software;
|
|
●
|
List
of deliverables;
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
For VIBRO
|
|
●Selection
of excitation frequency
boundary
●Selection
of excitation
duration
●Selection
of number of
accumulations
●Selection
of vibroseis
source layout
at surveyor' station
|
|
For VIBRO
|
|
● Selection
of frequency limit
radiation
● Selection
of lengths of
radiation
● Selection
of accumulation
numbers
● Selection
of vibrator array
geometry at the stake
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Parameter
|
Specification
|
|
Type
of source
|
vibration
group KZ-28 or analogous
|
|
Parameters
of vibration group
|
4
vibrators in line
|
|
Vibrator
pike intensification
|
60000
pounds
|
|
Distance
between vibrators
|
(is
going to be specified)
|
|
Shift
distance between swoops
|
*Shall
be specified
|
|
Length
of swoop
|
10
sec. (shall be specified)
|
|
Number
of swoops
|
4
(shall be specified)
|
|
Type
of swoop
|
Linear
|
|
Frequency
of swoop
|
10-90
Hz (shall be specified)
|
|
Conicity
of swoop
|
300
msec, cosinusiodal form (shall be specified at the
site)
|
|
●
|
Typ KZ-28 or
analogous
|
|
●
|
Vehicle
buggy
4x4
|
|
●
|
Maximal
ground
load 60,000
pounds.
|
|
●
|
Bed
plate
square 2,729
m2
|
|
●
|
Winter
variant vibrators
|
|
●
|
Electronics
of
vibrators Pelton
Advance II, version 6 c.
|
|
●
|
Concrete,
brick constructions, buildings ,
walls 25m
|
|
●
|
Insubstantial
buildings, divine service places, hospitals,
cemeteries
50m
|
|
●
|
Water
wells (depending on
construction) 50-75
m
|
|
●
|
Bridges
and
shads
25 m
|
|
●
|
Water
pipeline
50 m
|
|
●
|
Oil
pipe-line and
gas-line
50 m
|
|
●
|
Oil
and gas
wells
50 m
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Registering
system
|
24-bit
telemetric seismograph
|
|
|
Time
break
|
Put
in auxiliary channel
|
|
|
Pilot
swoop signal
|
Put
in auxiliary channel
|
|
|
Filter
swoop signal (wireline)
|
Put
in auxiliary channel
|
|
|
HF-filter
|
Switched
off
|
|
|
LF-filter
|
0,8
of Nyquist rate
|
|
|
Rejection
filter
|
Switched
off
|
|
|
Discretization
interval
|
2
ms
|
|
|
Useful
record length
|
6
s
|
|
|
Number
of geophones in groups
|
12
|
|
|
Registration
polarity
|
SEG
|
|
|
Excitation
source
|
Vibration
|
|
|
Record
medium
|
magnetic
cartridge 3490E, hard disc, DVD is as agreed upon with the
Company
|
|
|
●
|
apparatus
channel failed tests ;
|
|
●
|
sensitivity
or impedance of geophones group deviates more than 5% from average
number:
|
|
●
|
one
or more geophones in group was installed
incorrectly;
|
|
●
|
noise
level is 6 dB higher than noted on the adjacent traces
;
|
|
●
|
positioning
parameters are not complied with
requirements;
|
|
●
|
cross
feed is noticed;
|
|
●
|
dielectric
resistance of geophones is less than 1.0
Mom.
|
|
●
|
Settings
of seismograph are nor correct
|
|
●
|
Three
or more seismic channels are not working or each auxiliary channel is not
working;
|
|
●
|
Chamber
is not in working conditions;
|
|
●
|
There
is no field time outbreak;
|
|
●
|
There
are zero channels, other than cases when zero channels are resulted from
impossibility to install the channels due to natural
barriers;
|
|
●
|
Inappropriate
noise of level on the profile (noise level shall be agreed with the
representative of the Company at the site after
testing).
|
|
●
|
Two
adjacent channels are not working;
|
|
●
|
Two
or more channels for each 80 are not
working;
|
|
●
|
The
last record had no time break;
|
|
●
|
Chamber
is in not working conditions at the moment of registration of the last two
records;
|
|
●
|
Inappropriate
noise level on the profile.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
1.
|
incorrect
polarity;
|
|
2.
|
dead
route, pulsatile or its RMS differs from average
value;
|
|
3.
|
appropriate
apparatus channel is not complied with
specification;
|
|
4.
|
noise
level is 6 dB higher than noted on the adjacent
traces;
|
|
5.
|
positioning
parameters are not complied with
requirements;
|
|
6.
|
cross
feed is noticed;
|
|
7.
|
There
is steady component of signal on the route (as a result of
leakage);
|
|
1.
|
More
than 1 of each 80 routes are defected and
rejected;
|
|
2.
|
Three
or more adjacent routs are rejected, other than a permission from the
representative of the Company is
obtained;
|
|
3.
|
Data
were registered with inappropriate parameters of source or register or
inappropriate scripts and there is no possibility to make
corrections;
|
|
4.
|
Data
are not read from a magnet band;
|
|
5.
|
Record
length is smaller than nominal
value;
|
|
6.
|
There
are errors of synchronization and absence of information
about time break;
|
|
7.
|
Exciting
group geometry is not complied with positioning
clearance;
|
|
8.
|
Noise
level exceeded agreed one by more than 25%. The representative of the
Company may decrease that
requirement.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
7
|
Near-surface
works
|
|
●
|
Input
and automatic/manual swooping of the first inputs on seismograms of
MSK;
|
|
●
|
Adjusting
of hodograph with input of
corrections;
|
|
●
|
Strata
speed calculation with statistical error (interactive procession
mode);
|
|
●
|
Modeling
of NSS (LVL) along the profile with account of relief and MSK
data;
|
|
●
|
Statics
determination for each SP and GL;
|
|
●
|
Forming
of resultative SPS files,
|
|
●
|
Logging
of processed information in a single database of field
party.
|
|
●
|
Field
MSK data on CD (of hard disk) in format SEG-Y and on
paper;
|
|
●
|
Reprint
of models of MSK probes with calculated speeds and statistical
corrections;
|
|
●
|
MSK
location map.
|
|
●
|
Reports
of MSK operator with description of rocks in section of the well in
format MsExcel (.xls)
|
|
●
|
Static
corrections in SPS format.
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
Transformation
in inner format;
|
|
●
|
Geometry
input;
|
|
●
|
Geometry
control;
|
|
●
|
Edition
of defect routs;
|
|
●
|
Amplitude
recovery;
|
|
●
|
Input
of statistical corrections;
|
|
●
|
Deconvolution;
|
|
●
|
Band-pass
filtering;
|
|
●
|
Summing
(on 1-2 central lines of each
band);
|
|
●
|
Velocity
analysis through 2 km;
|
|
●
|
Summing
(on the first of central line of each
band);
|
|
●
|
Corrective
filtering;
|
|
●
|
Input
of stacked data on paper. Input of KK data shall be agreed with the
Company in advance.
|
|
●
|
FK-filtering
on raw data;
|
|
●
|
Spectral
balancing on raw data;
|
|
●
|
Obtaining
of additional in-line and cross - line sections (by sub-summing of routs
from the next band);
|
|
●
|
FK-filtering
on stacked record;
|
|
●
|
Spectral
balancing on stacked record;
|
|
●
|
Input
of cross-line;
|
|
●
|
Additional
input of stacked data on paper (all time scales are limited by
24”);
|
|
|
Producing
of additional copies of seismic data (more than 2) on cartridges 3490Е, DVD or
hard discs.
|
|
●
|
Sections
from the field SP (a copy) and in electronic
format;
|
|
●
|
SPS
files on CD.
|
|
|
Topographical material
quality control .
|
|
●
|
|
Checking
for doubling spots and skips in the data files. The skips shall be
explained, and doubling spots shall be absent before transferring
data;
|
|
●
|
|
Checking
for correctness of data headings and record
layout;
|
|
|
MOGT material quality
control.
|
|
●
|
|
Analysis
of testing of registering devises and
positioning;
|
|
●
|
|
Geometry
control;
|
|
●
|
|
SPS
files quality control;
|
|
●
|
|
Control
of observance of rotation graph for
testing;
|
|
●
|
|
QE
of seismograms for noise, reverse polarity, zero and incorrect
routs;
|
|
●
|
|
Edition.
|
|
|
Quality control system
software:
|
|
|
Packets
for quality control and processing of obtained materials, PRIME
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
|
manage
preparation of the field equipment for the Technical Audit of the
Company;
|
|
●
|
|
develop
and implement instruction for collection and processing of seismic data as
per the Agreement requirements;
|
|
●
|
|
provide
compliance with the Agreement requirements for whole period of collection
and processing of field data;
|
|
●
|
|
accept
field materials from the Technical Manager of seismic
party;
|
|
●
|
|
cooperate
with the Company’s Quality Control Supervisor at the site and take
decisions;
|
|
●
|
|
prepare
materials for transferring and delivery of data at the stated by the
Company addressee
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
The
toilets shall be arranged in the base and field
camp;
|
|
●
|
The
wagons-showers shall be arranged in both base and fly
camps;
|
|
●
|
A
laundry shall be arranged in the base
camp;
|
|
●
|
Periodical
change of linen shall be arranged both in base and fly
camps.
|
|
10.6.
|
Means
of communication
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
10.9.
|
HSE
measures
|
|
|
●
|
Medical
examination of personnel before departure to the field
works;
|
|
|
●
|
Arrangement
of first-aid office in the base
camp;
|
|
|
●
|
Permanent
presence of qualified doctor in the base
camp;
|
|
|
●
|
Arrangement
of the first-aid offices in the fly camps (if there well be a decision on
fly camps);
|
|
|
●
|
First-aid
training of personnel;
|
|
|
●
|
Keeping
of emergency service in the base camp in commission for its departure in
any time;
|
|
|
●
|
Participation
of medical personnel in cross-checks of all departments of the seismic
party;
|
|
|
●
|
Necessary
medicaments set.
|
|
●
|
Development
of Fire fighting Plans in the base camp and on the
profile;
|
|
●
|
Arrangement
and training of fire crew that consists of seismic party’s
personnel;
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
●
|
Installation
of fire-fighting shield in the base camp, next to the diesel-generators,
at the fuel station, on helipad, places of parking and repair of
transport. The fire-fighting shields shall have fire distinguishers,
spades, gaffs, boxes with sand;
|
|
●
|
Arrangement
of fire distinguishers in all wagons and vehicles. Periodical
control and renew of fire distinguisher with labeling of last and
following checks on their label
plates;
|
|
●
|
Maintenance
of mobile tank with technical water and pump in the base camp in instant
readiness;
|
|
●
|
Arrangement
of plates “No Smocking” and “Fire Hazard” in appropriate
places;
|
|
●
|
Fire
safety briefing of personnel training for use of fire distinguishers and
emergency fire blankets (kitchen
personnel);
|
|
●
|
Incorporation
of fire prevention matters in daily briefing in all
departments.
|
|
●
|
Development
and implementation of Environment Protection Plan for forthcoming seismic
works;
|
|
●
|
Ecological
monitoring: there shall be a qualified ecologist attend at the site to
control complying with Environment protection requirements and performing
of Environment protection measures stated in Environmental impact
Assessment and Environment protection
Plan;
|
|
●
|
Control
for prevention of POL leakage at the parking, repair of vehicles and on
the profile. Control for collection of waste oils and their delivery to
disposal;
|
|
●
|
in
adsorbent ground;
|
|
●
|
downhill
and off the camp;
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
On
behalf of
Geo
Seismic Service LLP
stamp
_______________________________
|
On
behalf of
Emir-Oil
LLP
stamp
__________________________________
|
|
Name:
Kalimukhanova Z.
Position: Director
|
Name:
T.K. Tolmakov.
Position:
General Director
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Field
party personnel for MOGT 3D
|
|
|
Position
|
Number
of personnel
|
|
3D
vibrators
|
|
|
Administrative
personnel
|
|
|
Manager
of party
|
1
|
|
Chief
engineer
|
1
|
|
Quality
Control Supervisor
|
1
|
|
HSE
Supervisor
|
1
|
|
Doctor
|
2
|
|
Ecologist
|
1
|
|
Permittmen
|
1
|
|
Total
|
8
|
|
Key
staff
|
|
|
Camp
manager
|
1
|
|
Sup
leis engineer
|
1
|
|
Chief
mechanic
|
1
|
|
Transport
mechanic
|
1
|
|
Camp
mechanic
|
1
|
|
Welder
|
1
|
|
Electrician
|
1
|
|
Elecrto-and-diesel
mechanic
|
3
|
|
Cook
|
3
|
|
Cook’s
assistant
|
3
|
|
Accountant
|
1
|
|
Dispatcher-radio
operator
|
2
|
|
Dispatcher
– POL refueler-stockkeeper
|
1
|
|
Cables-telephones
technicians
|
5
|
|
Security
of profile and camp
|
2
|
|
Laundress-charwoman
|
3
|
|
Camp
workers
|
1
|
|
Backer
|
1
|
|
Turner
|
1
|
|
PARTY
KEY STAFF, TOTAL
|
34
|
|
Technologic
personnel
|
|
|
Seismic
team
|
|
|
Senior
operator
|
1
|
|
Operator
|
2
|
|
Electronics
engineer
|
1
|
|
GML
chief
|
1
|
|
Linecheker
|
6
|
|
Lineboss
(profile manager)
|
1
|
|
Foreman
of collection/arrangement team
|
2
|
|
Seismic
team workers
|
25
|
|
Reelmen
(workers)
|
6
|
|
Driver-dieselman
of seismic station
|
1
|
|
Reeltransport
driver
|
6
|
|
Linecheker
transport driver
|
6
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Pusher
|
1
|
|
Seismic
team, total
|
59
|
|
Vibrator
team
|
|
|
Hydraulic
engineer
|
1
|
|
Operator
of vibrator
|
5
|
|
PARM
driver (turner)
|
1
|
|
Total
|
7
|
|
MSK
drilling team
|
|
|
Drill
operator
|
1
|
|
Assistant
of drill operator
|
2
|
|
Water
carrier driver
|
1
|
|
Total
|
4
|
|
Topography
team
|
|
|
Senior
topographer
processor
|
1
1
|
|
Topographer
|
4
|
|
Topography
team workers
|
4
|
|
Topography
vehicle driver
|
5
|
|
Topography
team, total
|
15
|
|
Field
office
|
|
|
Geophysicis-processor
KK
|
2
|
|
Geophysicis-processor
LVL, MCK
|
1
|
|
3D
scheduler
|
1
|
|
Field
office, total
|
4
|
|
TECHNOLOGIC
PERSONNEL, TOTAL
|
|
|
Attendance
crew
|
|
|
Motor-car
driver
|
3
|
|
Shift
team car driver
|
6
|
|
Profile
dinner car driver
|
1
|
|
Potable
water truck driver
|
1
|
|
Technological water
truck driver
|
1
|
|
Emergency
car driver-medical aid man
|
2
|
|
Economic
car driver
|
1
|
|
Petrol
tanker driver
|
2
|
|
Cessepolage
truck driver
|
1
|
|
Security
car driver
|
1
|
|
Attendance
crew, total
|
19
|
|
MSK
team
|
|
|
Operator
|
1
|
|
LVL/SRV
team workers
|
1
|
|
LVL/SRV
station car driver
|
1
|
|
Dropped
weight driver
|
1
|
|
MSK team,
total
|
4
|
|
Field
party staff, total
|
154
|
|
On
behalf of
Geo
Seismic Service LLP
stamp
_______________________________
|
On
behalf of
Emir-Oil
LLP
stamp
__________________________________
|
|
Name:
Kalimukhanova Z.
Position: Director
|
Name:
T.K. Tolmakov.
Position:
General Director
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
MOGT
3D field seismic party equipment
|
||
|
Description
|
Number
|
|
|
Field
party key content
|
||
|
Wagons
|
3D
Vibrators
|
|
|
Main
office
|
1
|
|
|
Dispatcher
office
|
1
|
|
|
Wagons
for the Customer’s Supervisor (office, accommodation)
|
1
|
|
|
Wagon
for Supervisors of AES JSC for two work places
|
1
|
|
|
Kitchen
|
2
|
|
|
Dining
room for 35 seats
|
2
|
|
|
Storehouse
|
1
|
|
|
warehouse
|
1
|
|
|
Refrigerator
|
1
|
|
|
Bath
house for 12 persons (or shower)
|
2
|
|
|
Laundry
|
1
|
|
|
Wood
toilets
|
3
|
|
|
Topography
wagon
|
1
|
|
|
Field
office
|
1
|
|
|
Geophysical
maintenance shop
|
3
|
|
|
Mechanical
shop
|
1
|
|
|
Medical
post
|
1
|
|
|
Club
for 20 sets (antenna, TV, video, chess, checks, domino)
|
1
|
|
|
Living
wagons
|
30
|
|
|
Propane
storehouse
|
1
|
|
|
Oxygen
storehouse
|
1
|
|
|
Total
|
57
|
|
|
Auxiliary
transport
|
||
|
Motor
cars, including for customer УАЗ-469,
НИВА
(UAZ-469, NIVA)
|
3
|
|
|
Emergency
car УАЗ-452,
ГАЗ-66
(UAZ-452, GAZ-66)
|
2
|
|
|
Shift
car УРАЛ-4320
(URAL-4320)
|
6
|
|
|
Economic
(business) car УРАЛ-4320
(URAL-4320) or ГАЗ-66
(GAZ-66)
|
1
|
|
|
Petrol
tanker УРАЛ-4320,
ЗИЛ-130
(URAL-4320, ZIL-130)
|
2
|
|
|
Potable
water truck УРАЛ-4320,
ЗИЛ-131
(URAL-4320, ZIL-130)
|
1
|
|
|
Technical
water truck УРАЛ-4320
(URAL-4320)
|
1
|
|
|
Cessepolage
truck ГАЗ-53, ЗИЛ-131
(GAZ-53, ZIL-131)
|
1
|
|
|
Dinner
transportation car
|
1
|
|
|
Profile
security car
|
1
|
|
|
Transport,
total
|
19
|
|
|
Power
plant ДЭС/DES 100
kW
|
2
|
|
|
Power
plant ДЭС/DES 200
kW
|
1
|
|
|
Tanks for
different purposes
|
||
|
Potable
water tank 5 m3
|
2
|
|
|
Technical
water tank 5
м3
|
2
|
|
|
POL
tank 10
м3
|
2
|
|
|
Lubricant
tank 0,2
м3
|
10
|
|
|
Tanks,
total
|
16
|
|
|
Welder
aggregate
|
1
|
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Septic
|
1
|
|
|
Plastic
tubes (kit)
|
1
|
|
|
Registering
equipment/O
|
||
|
Work
station 24-bit for3200
channels. I/O
|
1
|
|
|
Diesel-generator
15 kW
|
1
|
|
|
Surface
equipment
|
||
|
Surface
equipment for 3200 channels
|
3200
|
|
|
Chargers
|
2
|
|
|
Geophones
|
||
|
Geophone
sections SM-4/24 12 pcs.
for channel or analogous
|
3300
|
|
|
Testing
equipment
|
||
|
Handheld
terminal of checking/setting of LT
profile
|
1
|
|
|
Geophone
section tester
|
1
|
|
|
Topographical
equipment
|
||
|
Receivers
GPS Leica
SR530
|
4
|
|
|
Base
station GPS Leica
SR530
|
1
|
|
|
Controllers
|
5
|
|
|
Radiomodem
|
5
|
|
|
Portable
GPS receivers Garmin12,
|
3
|
|
|
Sowtware
|
1
|
|
|
Database
packet
|
1
|
|
|
PC
Pentium
|
2
|
|
|
Printer
HP LaserJet
6P
|
1
|
|
|
Plotter
HP DesignJet
500A0+
|
1
|
|
|
MSK
equipment
|
||
|
Registrator SGD-Sel or
GEODE
|
1
|
|
|
Software
packet for collection and processing of MSK data
|
1
|
|
|
PC
Pentium
MMX
|
1
|
|
|
Field
party transport
|
||
|
Seismic
team
|
||
|
Car
for seismic team ЗИЛ-131
(ZIL-131)
|
1
|
|
|
Linechecker
car Урал 4320
(URAL 4320) or Садко
(Sadko)
|
6
|
|
|
Reeltruck
Урал
4320 (URAL 4320)
|
0
|
|
|
Seismic
team, total
|
14
|
|
|
Topographical
team
|
||
|
Topographical
car ГАЗ-66 (Газ-71)
(GAZ-66; 71)
|
5
|
|
|
Topographic
team, total
|
5
|
|
|
MSK
drilling team
|
||
|
Drill
rig
УРБ2А2 (URB2A2)
|
1
|
|
|
Water
truck
|
1
|
|
|
MSK
drilling team, total
|
2
|
|
|
Vibrator
team
|
||
|
Vibrators
HEMI--50
|
5
|
|
|
PARM
|
1
|
|
|
Vibrator
team, total
|
6
|
|
|
MSK
team
|
||
|
LVL/MSK
stations ЗИЛ-131
(ZIL-131)
|
1
|
|
|
Dropped
weight
|
1
|
|
|
MSK
TEAM, TOTAL
|
2
|
|
|
Party
transport, total:
|
29
|
|
|
Party
transport, total:
|
48
|
|
|
Connection
|
||
|
Satellite
communication server and antenna
|
1
|
|
|
Radio
FM, mobile Motorola GM-300
|
27
|
|
|
radio
FM mobile Motorola GP-300
|
11
|
|
|
Hands
free-kit in base camp
|
1
|
|
|
Office
equipment of field party administrative office
|
||
|
Office
equipment are installed for providing of normal work of administrative
personnel and shall include:
|
||
|
PC
Pentium Desktop
|
4
|
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
Printer
HP LaserJet
|
1
|
|
|
Copying
devise
|
1
|
|
|
Fax
and other
|
1
|
|
|
Office
equipment of the Customer
|
||
|
Office
equipment is installed at will of the Customer and shall
include:
|
||
|
PC
Pentium
|
1
|
|
|
Printer
HP LaserJet
|
1
|
|
|
Description
|
Number
|
Type
|
|
Work
station
|
1
|
SGI Indigo2
IMPACT 1000 or analogous
PRIME
(or analog) – software
|
|
CPUs
|
1
|
4,3
GHz
|
|
RAM
|
1
|
8.0
Gb
|
|
Disk
drive
|
1
|
146
Gb
|
|
Magnet
band drive
|
2
|
M2488Cartridge
Tape Drive or analogous
|
|
Exabyte
|
1
|
Eliant
8500
|
|
Плоттер
|
1
|
HP
DesignJet 350C
|
|
Принтер
|
1
|
HP
DeskJet 1600 C
|
|
UPS
|
1
|
TRIPP
LITE 2000
|
|
PC Pentium
IV for 3D plsnning
|
|
|
OS
|
Windows
2000
|
|
CPU
|
Pentium
IV 1.7 GHz
|
|
RAM
|
256
Mb
|
|
HDD
|
40
Gb
|
|
PC Pentium
IV for MSK processing
|
|
|
OS
|
Windows
2000
|
|
CPU
|
Pentium
IV 1.7 GHz
|
|
RAM
|
256
Mb
|
|
HDD
|
40
Gb
|
|
On
behalf of
Geo
Seismic Service LLP
stamp
_______________________________
|
On
behalf of
Emir-Oil
LLP
stamp
__________________________________
|
|
Name:
Kalimukhanova Z.
Position: Director
|
Name:
T.K. Tolmakov.
Position:
General Director
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|
|
Agreement
|
3D
seismic exploration on the structures Begesh, Adai, North Aidai, West
Aksaz
|
|
On
behalf of
Geo Seismic Service
LLP
stamp
_______________________________
|
On
behalf of
Emir-Oil
LLP
stamp
__________________________________
|
|
Name:
Kalimukhanova Z.
Position: Director
|
Name:
T.K. Tolmakov.
Position:
General Director
|
|
Contractor:
______________________________________
|
Company:
“Emir-Oil” LLP
|